Shelf installation method and matters needing attention.

Source:www.longfugg.com Author:凱蘭德倉儲貨架廠 Release time:2022-06-08 Reading times: 625 Second

A, kay rand professional customized to install the warehouse shelves according to the regulation, seemingly installation is very simple, but it is not imagined, or each of us has our own installation method, each shelf factory is no exception, have been installed warehouse shelves are strict requirements, matter to guarantee supply good products, installed are essential steps.


Warehouse shelves


Second, the installation method


1, construction preparation


Before installation, should be familiar with drawings. For special or complex installation construction plan shall be established. Understand the installation site transportation roads, power supply, and so on and so forth. Roof and interior paint and other projects should be basically completed, on the basis of the floor, the channel should be completed, the concrete strength should be not less than 75% of the design strength; Installed near the construction site and sundry, garbage, etc., shall be clean.


2, the assembly pay-off


Assembly should be to correction of components one by one, to check the component size. According to the plan and the relevant lines to the axis of the building, edge and elevation, delimit the scope of construction. Determine baseline position, and in accordance with the benchmark for line drawing.


3, anchor bolt


Bolts at the bottom of the distance to the bottom of foundation shall not be less than 3 d, and shall not be less than 30 mm; The center distance between two bolts should not be less than 7.5 d. Plant expansion bolt drilling should prevent with base in steel, embedded pipe and cable buried objects touching one another; Shall not adopt any of the reserved hole. Plant expansion bolt foundation concrete strength shall not be less than 10 mpa. Bolts shall be used for floor crack parts.


4, erect column


Erect cylindrical piece according to the post piece height, weight, using artificial (pulley, etc.), mechanical (such as car hanging, etc.), equipped with a certain number of beams at the same time, a stable structure. Up after the sequence number, location, size according to figure to review, and elevation, vertical, horizontal, such as initial adjustment, if there are any other attachments are one by one, form a complete set of installation, make the data reach the standard, then in accordance with the line per column installation.


5, adjust


Horizontal and vertical adjustment should be made for shelf overall until up to the standard. Test under the beam deflection with stacker or fork lift should be tested for registration test. For all fasteners shall be tightened bolt should show nut 2 to 4 pitch; After countersunk head screw fastening, countersunk head should be buried into the component, shall not be exposed.


6, matters needing attention


Paid attention and acceptance of the corresponding have data are:


1) general (or according to the actual completed indicate the general layout of the modified);


2) design modification of the relevant information;


3) self test record;


4) other relevant data.


During the installation process be careful attention to every detail, the entire structure of shelves to ensure the intact, security firm.


Link:
Solemn statement: do not reprint the pictures of this website without permission. Violators will be prosecuted!
[statement] the purpose of reprinting online media manuscripts on this website is to spread more information. Such manuscripts do not represent the views of this website, and this website does not bear joint and several liability for the infringement of such manuscripts. Therefore, if you find that the content of this website infringes your copyright, please send the relevant content to this email【 vip@bjstb.com 】, we will delete it immediately after confirmation to ensure your copyright.

Related dynamics

  • 2023-05-30
  • 2023-05-30
  • 2023-05-22
  • 2023-05-22
  • 2023-05-22
  • 2023-05-10
Screenshot, wechat identification QR code
wechat:13701264023
(Click wechat copy to add friends)
Open wechat
天津市| 庆城县| 锦州市| 勐海县| 夏河县| 沂源县| 铁力市| 石阡县| 乌拉特中旗| 开封县| 若羌县| 阳泉市| 毕节市| 广西| 东港市| 安岳县| 丁青县| 巴楚县| 阿克苏市| 昌平区| 台北县| 英吉沙县| 深泽县| 兴海县| 洛扎县| 上高县| 西藏| 新兴县| 明水县| 克拉玛依市| 天祝| 青海省| 纳雍县| 栖霞市| 乌兰县| 东乌珠穆沁旗| 平泉县| 宁乡县| 尼木县| 吉木萨尔县| 德州市|