人妻无码精品久久亚瑟影视,国内精品九九久久精品小草,99久无码中文字幕一本久道,日本中文字幕有码在线视频

Welcome to our official website

National Service Hotline:15632799296

KAILANDEDYNAMIC

ABOUT DYNAMIC

Recommended reading:

Hot Tags:

貨架 倉儲貨架 倉庫貨架 輕型貨架 中型貨架 重型貨架 庫房貨架 貨架 貨架廠家 貨架供應(yīng)商 高位貨架 北京貨架

Construction of chengdu warehouse need to know what data

Source:www.longfugg.com Author:凱蘭德自動化立體庫廠 Release time:2022-06-23 Reading times: 532 Second

Build three-dimensional warehouse need to know what data?


One, the main performance parameters:


1, inventory capacity; 2, system operation capacity; 3, information processing; 4, the surrounding logistics handling; 5, man-machine connection capacity.


Second, the need to complete an automated stereoscopic warehouse planning, should arrange the experienced staff to work in the following:


1, the demand analysis; 2, determine the unit form and specification of goods; 3, determine the unit form and specification of goods; 4, to set up the model; 5, determine the technological process, the ability to work on the warehouse system imitation calculation; 6, to determine control mode and warehouse management; 7, determine the technical parameters and configuration of the automation system; 8, determine the boundary conditions; 9, puts forward the construction and utility requirements; 10, forming a complete system of technology solutions.


Three, require companies to purchase should be clear in advance the specific requirements for equipment:


1, functional requirements; 2, the requirement of the degree of automation; 3, auxiliary requirements; 4, system scope of work and procurement scope; 5, boundary condition; 6, time limit for a project requirements; 7 and service requirements.


Four, several problems that should be paid attention to:


1, don't be the pursuit of a single equipment performance, and ignored the overall system performance.


2, the demand for different, the key is to meet the requirements of their own use. Request too low doesn't reach the need to use, requires too much could lower the system cost is too high, the stability, is hard to implement and maintain, or poor flexibility.


3, to determine the construction period to seek truth from facts, short time limit for a project may lead to a drop in the quality of system, or could not have completed project on schedule.


4, system maintenance is very important, and we maintain the right of the car, should be regularly to maintain system, make the system in good working condition, prolong the service life of system, discover the problem.


5, good for the use of automated stereoscopic warehouse, need to have highly qualified management and maintenance personnel, need to have the corresponding supporting measures.

Link:
Solemn statement: do not reprint the pictures of this website without permission. Violators will be prosecuted!
[statement] the purpose of reprinting online media manuscripts on this website is to spread more information. Such manuscripts do not represent the views of this website, and this website does not bear joint and several liability for the infringement of such manuscripts. Therefore, if you find that the content of this website infringes your copyright, please send the relevant content to this email【 vip@bjstb.com 】, we will delete it immediately after confirmation to ensure your copyright.

Related dynamics

  • 2023-05-30
  • 2023-05-30
  • 2023-05-22
  • 2023-05-22
  • 2023-05-22
  • 2023-05-10
Screenshot, wechat identification QR code
wechat:13701264023
(Click wechat copy to add friends)
Open wechat
湖北省| 安新县| 陆河县| 辰溪县| 平陆县| 芷江| 怀仁县| 隆昌县| 防城港市| 嘉峪关市| 晋江市| 乐山市| 宜章县| 和政县| 宝应县| 庆安县| 罗定市| 团风县| 邵阳县| 东平县| 洛南县| 班玛县| 澎湖县| 庆阳市| 合川市| 饶平县| 长兴县| 涿鹿县| 龙井市| 巴林左旗| 图片| 赤水市| 仪征市| 鲜城| 菏泽市| 云南省| 博罗县| 堆龙德庆县| 中西区| 通化市| 麻栗坡县|